I-ESON Great Lakes 2T1A Sport Trainer
 
Great Lakes 2T1A-VR I-ESON
"the Outatime Flyer"

Cirrus powered Great Lakes
   
April, 15th - 2006

Trimming and finishing the turtle deck.
I have trimmed and sanded all the corners and cut the back end of the stringers to be all the same long.
Off course this is not fundamental for structure strenght, but is good for the eye and also for the later fabric covering.

I have also fitted nutplates where the turtledeck joins the cockpit coaming frame.
You will always find plenty of nutplates in my project, whereever I suspect a later need of inspection/reparation.
Having the turtledeack bolted to the cockpit coaming frame instead of riveted together will allow removing the cockpit frame one day in case it will be necessary.
The turtledeck will be fabric covered while the cockpit top and side will be covered with removable sheet metal panels.
This will add some weight on my project, but I would save it somewhere else (i.e. some heavy nstruments and equipments). The turtle deck has also been sprayed with a layer of yellow zinc chromate and is now ready for covering (scheduled for 2008...maybe..)



trimmed for a fit test

riveting nutplace for cockpit frame conjunction

another fit test

primed and ready for covering

Go to diary page

 
        Legal disclaimer: This site is NOT the official Great Lakes Aircraft Company site. The contents of this site are the opinion of the author, not CAP, FAA or ENAC. Please check all information is correct before you act upon it.