|
|||||||
Great Lakes 2T1A-VR I-ESON "the Outatime Flyer" |
January 8th - 2008
Have to stop with the engine cowling, waiting for new sheets of metal of the right alloy.So I've started running some electrical wires from the cockpit to the firewall, passing them through grommets inside the side panels' frame. I've labeled the wires for right connections.
|
||||||
| Legal disclaimer: This site is NOT the official Great Lakes Aircraft Company site. The contents of this site are the opinion of the author, not CAP, FAA or ENAC. Please check all information is correct before you act upon it. | |||||||
![]() |