|
|||||||
Great Lakes 2T1A-VR I-ESON "the Outatime Flyer" |
March 12th - 2008
Working on monday tonight. Torrow night features the Champion's League big match Inter Vs. Liverpool, can't miss it.We go on with the engine cowling; Afterall, I have opted for a Hybrid solution, riveting together the half-panels of the sides but going to weld them together too; So I have shrink-curved some aluminum angles (L and T section) and going to rivet them inside the panels; this will give enough strenght to the piece and will help to keep the shape. Saturday afternoon: riveted the reinforcement inside the left-side panel; starting with the right side.
|
||||||
| Legal disclaimer: This site is NOT the official Great Lakes Aircraft Company site. The contents of this site are the opinion of the author, not CAP, FAA or ENAC. Please check all information is correct before you act upon it. | |||||||
![]() |